Analisis Kinerja Proyek Konstruksi Menggunakan Metode Nilai Hasil (Earned Value Methode) (Studi Kasus Proyek Pekerjaan Jalan dan Saluran Utama Row 46 Segemen II Jakarta Garden City)

Authors

  • Agus Sasmita Program Studi Teknik Sipil Fakultas Teknik, Universitas Pakuan, Bogor, Indonesia

DOI:

https://doi.org/10.55681/jige.v5i3.3411

Keywords:

Conventional Cost Management, Earned Value, Project Performance

Abstract

Planning and controlling construction projects to get project performance according to plan is very important to do, especially related to cost, quality and time. To get these results, a good and appropriate control method is needed. The most common and commonly used methods are the Conventional Cost Management Method and the Earned Value Method where the two methods have the same goal, namely to control the performance of a good, effective and efficient project. However, in its application it is different, where the conventional cost management method uses two cost indicators, namely planned costs and realization costs and focuses on controlling time performance, while the result value method uses three cost indicators, namely planned costs (BCWS), realized costs (BCWP) and actual costs from accounting (ACWP) which include cost and time performance control. Calculations and analyses were carried out in week 7 and week 16. The results of the analysis of the two methods in the 7th week of project performance show progress (schedule underrun) with costs incurred greater than planned (cost overrun) in week 16 experiencing delays (schedule overrun) with costs incurred greater than planned (cost overrun).

Downloads

Download data is not yet available.

References

Astari, M. D. (2017). Analisa Earned Value Concept dan Cost Varians pada Pekerjaan Jalan Wilayah Painan-Kambang Sumatra Barat. Jurnal Kajian Teknik Sipil (JKTS). 2(1). 40-57. DOI: https://doi.org/10.52447/jkts.v2i1.581

Dharmawan, R. D., Safarizki, H. A., & Firdausi, A. A. (2023). Evaluasi Efektivitas Keputusan Addendum Proyek Terhadap Waktu Pekerjaan Proyek Berbasis Earned Value Method. J@ti Undip: Jurnal Teknik Industri, 18(1), 51-61. https://doi.org/10.14710/jati.18.1.51-61

Fleming, Q.W., & Koppelman J. M. (2016). Earned Value Project Management. 4th Edition. PMI : Project Management Institut

Husen, A. (2009). Manajemen Proyek : Perencanaan, Penjadawalan, & Pengendalian Proyek. Yogyakarta : Penerbit Andi, edisi revisi.

Indraga, K. F. (2015). Analisa Kinerja Biaya Dan Jadwal Terpadu Dengan Konsep Earned Value Method. S1 thesis, Universitas Muhammadiyah Yogyakarta.

Khairunnisa, N., Widayati, R. & Jamal, M. (2020). Analisis Pengendalian Biaya Dan Waktu Terhadap Proyek Konstruksi Dengan Metode Earned Value (Studi Kasus: Proyek Perumahan Penajam Paser Utara). TEKNOLOGI SIPIL : Jurnal Ilmu Pengetahuan dan Teknologi. 4(1). 9-19. DOI: http://dx.doi.org/10.30872/ts.v4i1.4925

Meliasari, I., Indrayadi, M. & Lusiana.(2013). Earned Value Analysis terhadap Biaya dan Waktu pada Proyek Konstruksi. Jurnal Mahasiswa Teknik Sipil Universitas Tanjungpura. 2(2), 1-11.

Mirnayani, & Armansyah. (2016). Penerapan Earned Value Method Sebagai Alat Ukur Kinerja Biaya dan Jadwal pada Proyek Apartemen Easton Park Serpong. Jurnal Rekayasa Sipil, 5(1), 8–16.

Pamungkas, A.,Sugiarto, & Setiono.(2013). ANALISIS NILAI HASIL TERHADAP WAKTU DAN BIAYA PADA PROYEK KONSTRUKSI (Studi Kasus Pada Proyek ICB Civil Work Construction off Spillway of Countermeasures for Sedimen in Wonogiri). e-Jurnal MATRIKS TEKNIK SIPIL. 1(4), 417-423. DOI: https://doi.org/10.20961/mateksi.v1i4.37495

Pastiarsa, M. (2015). Menyusun Estimasi Biaya Proyek. Yogyakarta : Teknosain.

Priyo, M. & Zhafira, T. (2017). Penerapan Metode “Earn Value” Dan “Project Crashing” Pada Proyek Konstruksi: Studi Kasus Pembangunan Gedung IGD RSUD Sunan Kalijaga, Demak. Semesta Teknika. 20(1). 29-50. DOI: https://doi.org/10.18196/st.v20i1.2434

Soeharto, I. (2001). Manajemen Proyek : Dari konseptual Sampai Operasional. Jakarta : Erlangga.

Soltan, S. & Ashrafi, M. (2020). Predicting Project Duration And Cost, and Selecting The Best Action Plan Using Statistical Methods for Earned Value Management. Journal of Project Management, 5(3), 157–166

Utari, Rini Pebri & Lintang Satiti M. (2019). Pengendalian Biaya dan Waktu dengan Pendekatan Metode Earned Value Concept (EVM) (Studi Kasus : Proyek Pembangunan Gedung Rawat Inap kelas 3 Cempaka RSUD Kab Tabanan-Bali. Jurnal Media Teknik Sipil, 17(2), 9-15.

Downloads

Published

2024-09-30

How to Cite

Sasmita, A. (2024). Analisis Kinerja Proyek Konstruksi Menggunakan Metode Nilai Hasil (Earned Value Methode) (Studi Kasus Proyek Pekerjaan Jalan dan Saluran Utama Row 46 Segemen II Jakarta Garden City). Jurnal Ilmiah Global Education, 5(3), 2413–2427. https://doi.org/10.55681/jige.v5i3.3411